February 10, 2025
Map showing 2023 new well 30 day Initial Productivity (IP) for major US Gas Basins.
- Haynesville has the highest new well 30 day IP at 20 MMcf/d.
- It is followed closely by Utica at just under 20 MMcf/d and Marcellus SW and NE at about 15 MMcf/d.
- Anadarko and Permian have the lowest IP at about 5 MMcf/d.
See Also:
Estimated Ultimate Recovery (EUR) of Major US GAS Basins 2023