Oil sands full cycle cost by category showing the average compared to in situ and mining operations.
- Over the past decade exit pipeline capacity from Alberta has become tight. There has been limited number Greenfield expansion projects in the Alberta.
- Overall, full-cycle cost for Oil Sands has averaged US$42.70/Bbl.
- Driven by both higher CAPEX and OPEX costs, new mining projects are more expensive averaging US$51.50/Bbl.
- New in situ projects are averaging US$33.90/Bbl.
* 15% Rate of return has been incorporated into the overall capital cost